User manual HAWKE 501-453-UNIV EXD IIC-EXE II-EXTD ASSEMBLY AI300 ISSUE N 09-09

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual HAWKE 501-453-UNIV EXD IIC-EXE II-EXTD. We hope that this HAWKE 501-453-UNIV EXD IIC-EXE II-EXTD user guide will be useful to you.


HAWKE 501-453-UNIV EXD IIC-EXE II-EXTD ASSEMBLY AI300 ISSUE N 09-09: Download the complete user guide (280 Ko)

Manual abstract: user guide HAWKE 501-453-UNIV EXD IIC-EXE II-EXTDASSEMBLY AI300 ISSUE N 09-09

Detailed instructions for use are in the User's Guide.

[. . . ] Assembly Instructions for cable gland: 501/453/UNIV Exd IIC/Exe II/ExtD Operating temperature range -60°C +80°C 1 2 International Assembly Instructions AI 300 / Issue N - 09/09 Certification Details Gland Type: 501/453/UNIV Exd IIC/Exe II/ExtD Baseefa06ATEX0057X II 2 GD A21 IP66 IECEx BAS06. 0014X CEPEL-EX-063/2001X GOST R No: POCC GB. 05. B01831 CSA No: 1015065 (LR 78713-7) CNEx07. 0900X 3 4. 1 Reversible Armour Clamping Ring (RAC) General identification ring orientation for: SWA Position Braid 'X', Flat Steel Wire 'Y', Steel Tape 'Z' Ring Position 4 5 1. 4. 1 5. Backnut Middle Nut Reversible Armour Clamping Ring (RAC) Diaphragm Seal / Armour Spigot Cable Guide Entry (with captive deluge seal) IMPORTANT: The arrowhead indicating the correct armour thickness or type should point towards the equipment Note: Cable acceptance sizes are marked on the diaphragm seal, clamping ring and backnut. Cable Preparation Gland Preparation Armour / braid II 4. 1 4 5 I I 4 3 2 1 3 2 Note: Tape armour must be re-trimmed at 90° to the vertical axis of the cable after it has been spread, to ensure that the full face is correctly presented. Roll back option 3 1 2 Shroud option 1 A Strip cable to suit equipment as shown above and expose the armour / braid 'I'. [. . . ] Registered Office: Mitre House, 160 Aldersgate Street, London EC1A 4DD. A member of the Hubbell Group of Companies Hawke International UK Office Oxford Street West, Ashton-Under-Lyne, Lancashire OL7 0NA. UK www. ehawke. com Sales: +44 (0) 161 830 6698 Technical: +44 (0) 161 830 6697 Fax: +44 (0) 161 830 6648 E-mail: sales@ehawke. com 5mm minimum recommended 5 5 4 3 2 5 2 1 2 1 1 D Hold the entry in position with a spanner / wrench to prevent rotation. Hand tighten the middle nut to the entry and turn a further 1/2 to 3/4 of a turn with a spanner / wrench. To ease wiring inside the enclosure, it may be beneficial to strip the inner sheath of the cable as shown above. E Unscrew the middle nut and visually inspect that the armour / braid has been successfully clamped between the diaphragm seal / armour spigot and the armour clamping ring . If armour / braid not clamped, repeat assembly. F Reassemble middle nut onto the entry component . Tighten up the middle nut until hand tight, then using a wrench / spanner, turn the nut through 1/4 turn. Tighten the backnut to form a seal around the cable, then tighten a further full turn using a wrench / spanner. Ensure that the middle nut does not rotate when tightening the backnut . Note:The deluge seal on this gland locates on assembly and requires no further action. [. . . ] Sealing washer, to offer additional ingress protection of the enclosure at the cable gland entry. Serrated washer, to dampen any vibrations that may loosen the locknut or cable gland assembly. AI 300 - Issue N / Page 2 of 2 [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE HAWKE 501-453-UNIV EXD IIC-EXE II-EXTD




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual HAWKE 501-453-UNIV EXD IIC-EXE II-EXTD will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.